Perlan 140 set for glass leaves

Track Perlan 140 * Track for sliding door fitting

Perlan 140 Track
  • Track for sliding door fitting with leaf weight up to 140 kg
Contact us

Application Areas

  • For leaf weights up to 140 kg
  • For timber, plastic, glass and metal leaves
  • Suitable for Perlan roller carriage

Technical data

Track Perlan 140
Leaf weight (max.) 140 kg

Downloads

Product shot

Product data sheet

User manual

Installation instructions

Wiring diagram

Supplementary sheet

Installation drawing

Variants & Accessories

Contact