Radar movement detectors

GC 307+ Non-contact proximity switch for activating automatic doors

GC 307+ Manual, flush-mounted, blue
  • Doors can be opened without a requirement for tactile perception
  • External input for LED colour change
  • Detects persons and objects in a detection area of 10 - 60 cm
  • Scanning ranges adjustable to make environmentally and user-specific adjustments
  • Hand-height mounting ensures convenient, barrier-free access
  • Can also be installed behind tiles or glass
Show more
  • Adjustable via DIP switch and remote control; acoustic feedback, LED colours, LED animations, pulse/toggle mode
  • WC control function for locking and automatic unlocking of toilets
Contact us

Application Areas

  • Non-contact activation of automatic swing, sliding, folding, revolving and curved sliding doors
  • Interior and external doors
  • Rooms with high hygiene demands

Technical data

GC 307+
Dimensions 80 x 80 mm
Technology Electromagnetic radar waves
Operating voltage 12-24 V DC +30% /-10% / 12-24 V AC ± 10%
Output Electrical relay
IP rating IP65
Cable connection type Screw terminal
Adjustability Per DIP switch, with remote control
Installation height at hand level
Transmission frequency 24.15 GHz
Service temperature -20 - 55 °C
Standard conformity RED 2014/53/EU, RoHS 2011/65/EU

Variants & Accessories

Contact